A JCB weighing 22 tons is on top of a lowboy trailer and heading east on Interstate 70 near Hays, Kansas ..
The extended shovel arm is made of hardened refined steel and the approaching overpass is made of commercial-grade concrete, re-inforced with 1 1/2 inch steel rebar spaced at 6 inch intervals in a criss-cross pattern layered at 1 foot vertical spacing.
Question:
When the shovel arm hits the overpass, how fast do you have to be going to slice the bridge in half ?
(Assume no effect for headwind and no braking by the driver...)
Extra Credit:
(Assume no effect for headwind and no braking by the driver...)
Extra Credit:
What is the time and distance required for the entire rig to come to a complete stop after hitting the overpass at the speed calculated above.
Yes, you can neglect friction.
No, I couldn't solve it either......but who cares;
The pictures are great!
Yes, you can neglect friction.
No, I couldn't solve it either......but who cares;
The pictures are great!
No comments:
Post a Comment
Note: only a member of this blog may post a comment.